  • Location: At and near the Braddock Avenue/Kenmawr Avenue ramp, which is located between Talbot Avenue and Line Street in Rankin
  • Current traffic restrictions: The Talbot Avenue ramp, located between the Braddock Avenue/Kenmawr Avenue/Talbot Avenue intersection and Fleet Street, will close starting at 9 a.m. on Monday, April 7. Also, Kenmawr Avenue will be reduced to a single lane of traffic in each direction between Carrie Furnace Boulevard and Braddock Avenue.
  • Project start date: March 4, 2023
  • Estimated traffic restrictions end date: November 2025
  • Scope of work: Replacement of the Braddock Avenue/Kenmawr ramp, repairs to a Rankin Bridge ramp (Rankin/Braddock exit), and reconstruction of the Braddock Avenue/Kenmawr Avenue/Talbot Avenue intersection. That includes new pavement, sidewalk, curb, drainage, barrier and guide rail, traffic signals, roadway lighting, signage, and pavement markings.
  • Primary contractor: Mosites Construction Company
  • Estimated cost: $9.3 million

Overview

  • Location: At and near the Braddock Avenue/Kenmawr Avenue ramp, which is located between Talbot Avenue and Line Street in Rankin
  • Current traffic restrictions: The Talbot Avenue ramp, located between the Braddock Avenue/Kenmawr Avenue/Talbot Avenue intersection and Fleet Street, will close starting at 9 a.m. on Monday, April 7. Also, Kenmawr Avenue will be reduced to a single lane of traffic in each direction between Carrie Furnace Boulevard and Braddock Avenue.
  • Project start date: March 4, 2023
  • Estimated traffic restrictions end date: November 2025
  • Scope of work: Replacement of the Braddock Avenue/Kenmawr ramp, repairs to a Rankin Bridge ramp (Rankin/Braddock exit), and reconstruction of the Braddock Avenue/Kenmawr Avenue/Talbot Avenue intersection. That includes new pavement, sidewalk, curb, drainage, barrier and guide rail, traffic signals, roadway lighting, signage, and pavement markings.
  • Primary contractor: Mosites Construction Company
  • Estimated cost: $9.3 million

Questions about the Project?

Please let us know if you have any questions or concerns about the Braddock Avenue/Kenmawr Avenue ramp replacement project.

loader image
Didn't receive confirmation?
Seems like you are already registered, please provide the password. Forgot your password? Create a new one now.
Page last updated: 24 Mar 2025, 01:16 PM