Youghiogheny Bridge No. 14 Repairs Project
Share Youghiogheny Bridge No. 14 Repairs Project on Facebook
Share Youghiogheny Bridge No. 14 Repairs Project on Twitter
Share Youghiogheny Bridge No. 14 Repairs Project on Linkedin
Email Youghiogheny Bridge No. 14 Repairs Project link
Overview
Location: East Smithfield Street near Antonelli Drive in Elizabeth Township
Traffic restriction: Full closure of East Smithfield Street near Antonelli Drive in Elizabeth Township
Project start date: April 20, 2026
Estimated project end date: June 2026
Scope of work: Replacement of a culvert named Youghiogheny Bridge No. 14. Project also includes roadway repairs, drainage improvements, and installation of guide rail and pavement markings.
Primary construction contractor: Pugliano Construction
Estimated cost: $126,444
Car Detour
Westbound detour
- From East Smithfield Street, turn right onto Moray Lane
- Turn left onto Zimmer Hill Road
- Turn right onto Greenock Buena Vista Road
- Turn left to stay on Greenock Buena Vista Road
- Turn right onto Ridge Road
- Turn right onto Broadlawn Drive
- Turn right onto Route 48
- Veer right onto Boston Hollow Road
- Turn right onto East Smithfield Street (if needed)
Eastbound detour
- Same as the eastbound detour in the opposite direction
Truck Detour
Westbound detour
- From East Smithfield Street, turn right onto Moray Lane
- Turn left onto Zimmer Hill Road
- Turn right onto Greenock Buena Vista Road
- Turn left to stay on Greenock Buena Vista Road
- Turn right onto Broadlawn Drive
- Turn right onto Route 48
- Veer right onto Boston Hollow Road
- Turn right onto East Smithfield Street (if needed)
Eastbound detour
- Same as the eastbound detour in the opposite direction
Questions about the Project?
Please let us know if you have any questions or concerns about the Youghiogheny Bridge No. 14 Repairs Project.
Page last updated: 29 Apr 2026, 01:38 PM
Thank you for your contribution!
Help us reach out to more people in the community
Share this with family and friends