Youghiogheny Bridge No. 14 Repairs Project
Share Youghiogheny Bridge No. 14 Repairs Project on Facebook
Share Youghiogheny Bridge No. 14 Repairs Project on X (formerly Twitter)
Share Youghiogheny Bridge No. 14 Repairs Project on Linkedin
Email Youghiogheny Bridge No. 14 Repairs Project link
Overview
Location: East Smithfield Street near Antonelli Drive in Elizabeth Township
Traffic restriction: Full closure of East Smithfield Street near Antonelli Drive in Elizabeth Township
Project start date: April 20, 2026
Estimated project end date: June 2026
Scope of work: Replacement of a culvert named Youghiogheny Bridge No. 14. Project also includes roadway repairs, drainage improvements, and installation of guide rail and pavement markings.
Primary construction contractor: Pugliano Construction
Estimated cost: $126,444
Car Detour
Westbound detour
- From East Smithfield Street, turn right onto Moray Lane
- Turn left onto Zimmer Hill Road
- Turn right onto Greenock Buena Vista Road
- Turn left to stay on Greenock Buena Vista Road
- Turn right onto Ridge Road
- Turn right onto Broadlawn Drive
- Turn right onto Route 48
- Veer right onto Boston Hollow Road
- Turn right onto East Smithfield Street (if needed)
Eastbound detour
- Same as the eastbound detour in the opposite direction
Truck Detour
Westbound detour
- From East Smithfield Street, turn right onto Moray Lane
- Turn left onto Zimmer Hill Road
- Turn right onto Greenock Buena Vista Road
- Turn left to stay on Greenock Buena Vista Road
- Turn right onto Broadlawn Drive
- Turn right onto Route 48
- Veer right onto Boston Hollow Road
- Turn right onto East Smithfield Street (if needed)
Eastbound detour
- Same as the eastbound detour in the opposite direction
Please let us know if you have any questions or concerns about the Youghiogheny Bridge No. 14 Repairs Project.