March 3, 2025

The four-lane Glenwood Bridge in Pittsburgh will be reduced to two lanes – one in each direction – starting at 9 a.m. on Monday, March 17, 2025. The lane closures are expected to end in November 2025. They are required for the replacement of 11 expansion dams, barrier replacement, and pier repairs.

Drivers might experience traffic delays on and near the bridge during the lane closures, and they are urged to slow down and use caution at the work zone.

Share March 3, 2025 on Facebook Share March 3, 2025 on Twitter Share March 3, 2025 on Linkedin Email March 3, 2025 link
#<Object:0x0000000044692820>